Mahindra Charge_iN Reaches 50 Stations and 200 Charging Points in India
Mahindra says its Charge_iN public fast-charging network has reached 50 operational stations and 200 charging points as of 24 September 2026. The milestone includes the first operational site under its HPCL collaboration, at HP Auto Care Centre in Sajgaon on the Mumbai–Pune Expressway. The network i...
Mahindra says its Charge_iN public fast-charging network has reached 50 operational stations and 200 charging points as of 24 September 2026. The milestone includes the first operational site under its HPCL collaboration, at HP Auto Care Centre in Sajgaon on the Mumbai–Pune Expressway. The network is open to EVs from multiple brands, so this is an infrastructure update for more drivers than Mahindra owners alone.
Charge_iN network: live numbers versus the target
The distinction between stations and charging points matters. A station is a physical location; it can offer more than one point where a vehicle connects. Mahindra's current count is 50 locations and 200 points. Its plan for December 2027 is 250 stations and about 1,000 points. The latter figures are targets, not facilities already available to drivers.

| Measure | September 2026: live | December 2027: target |
|---|---|---|
| Charging stations | 50 | 250 |
| Charging points | 200 | About 1,000 |
On those figures, the current network represents one-fifth of the stated station goal and roughly one-fifth of the planned point count. That is a progress comparison, not a forecast of when the remaining locations will open. Availability at any individual site should be checked before a journey.
Where the HPCL partnership begins
The Sajgaon installation on the Mumbai–Pune Expressway is the first site operating under Mahindra's HPCL collaboration. It provides a concrete example of the company's highway-site expansion rather than a promise about every HPCL outlet. Mahindra describes the network as using 180 kW dual-gun chargers and says it can serve EVs across brands. The charging rate a particular car achieves will still depend on its own charging capability, battery state and site conditions.
What this means for Indian EV drivers
More public fast-charging locations can make inter-city trips easier to plan, particularly on busy routes such as Mumbai–Pune. The useful question for a driver is whether a compatible connector and an available charger exist on the intended route, not just the national station total. Check the operator's current station map, connector details and live availability before relying on a stop.
For the wider EV market, the multi-brand access is the notable part of this announcement. It can add capacity for drivers who do not own a Mahindra EV. The 2027 target also gives a clear measure against which future expansion announcements can be checked.
FAQs
How many Charge_iN stations are operating?
Mahindra reported 50 live stations with 200 charging points on 24 September 2026.
Is the target of 250 stations already operational?
No. Mahindra describes 250 stations and about 1,000 points as its December 2027 target.
Can other EV brands use Charge_iN?
Mahindra says the network is open to multiple EV brands. Drivers should confirm connector compatibility and current site availability for their vehicle.
Charge_iN's 50-station milestone is a measurable step in India's public charging rollout. The next meaningful check is how the live station map grows from here against Mahindra's December 2027 goal.
Explore the story
Related news
No comments yet
Be the first to share your thoughts!
Want to read more automotive news?
Stay updated with the latest car launches, reviews, and industry insights.
Browse All News




